26
PERFORMANCE CHECKLIST FOR THE
MICRON ULVA FAN MK II SPRAYER
(NSN: 3740-01-206-9636)
TESTING OF ENVIRONMENTAL CONDITIONS
FOR ULV APPLICATION
A. Check the weather conditions expected during the
spray operations, REMEMBER, YOU SHOULD NOT
CONDUCT ULV OPERATIONS IN THE RAIN OR IN
STRONG WINDS.
B. Check for a temperature inversion. A temperature
inversion has occurred when the air temperature at
six feet above the ground is at least one degree
warmer than the ground temperature (This situation
usually occurs in the early morning and late evening
hours).
C. Check the wind speed by using a wind-measuring
device. The indicated wind speed should fall
between 4-6 MPH and should be blowing across the
intended target area.
SET-UP PROCEDURES
1. Plug the battery charger into the gel-cell battery.
Charge the battery following a 2 hours on: 2 hours
off schedule until the battery has at least an 80%
charge. DO NOT FOLLOW THE RECHARGING
INSTRUCTIONS IN THE OPERATOR'S MANUAL
OR THE LIFESPAN OF THE BATTERY WILL BE
DRASTICALLY REDUCED.
Comentarios a estos manuales