125
b. Depress the calibration button.
c. Put tube into graduated cylinder at the same
time.
d. Hold for one minute.
e. Check the flow rate and adjust the pump as
needed. (Flow rate is found on the pesticide
label.)
f. Recheck for one minute.
16. Turn on all switches.
a. First turn on circuit breaker located on the outside
of the electrical control box. (Located next to the
hour meter.)
b. Blower Circuit breakers for the blower, spray
head, and pump are located inside of the
electrical control box.
17. Depress the power switch, located on remote control
panel.
a. The switch indicator light will illuminate and the
fan and spray head will start. The spray head will
run at idle speed (about 15,000 rpm).
b. The spray head will accelerate to its spraying
speed and the blower will start.
Comentarios a estos manuales