108
OPERATING PROCEDURES
18. Using the Spray Gun Assembly
a. Close the pressure relief valve, located until 200
psi reads on the pressure gauge.
b. Unwind the hose from the spindle and examine it
for possible leaks.
c. Open all three inline flow valves to the gun.
d. Point the gun at the intended target area and pull
the trigger. Adjust spray pattern as needed.
19. Using The Boom Assembly
a. Unhook and GENTLY let down the boom, or
booms (depending on what is required for the
operation).
b. Ensure that both spray gun's inline flow valves
are closed.
c. Select the proper setting on large valve located
on left front of tank to boom or booms needed
(i.e., center-left-right or left-center-right).
d. Turn the pressure relief valve until the pressure
gauge on the boom selector valve reads 40 psi.
This is to be done after turning on the (two) inline
valves located behind the pressure relief valve at
the right front of tank. (i.e., pull top rope forward
Comentarios a estos manuales