DOD SR400D Especificaciones Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
17
 8. Adjust the pesticide flow rate by pulling the slide
bar located on the discharge tube directly below
the tank. To increase the flow, pull the bar, and to
decrease the flow, push the bar back into its
housing.
TERMINATING PROCEDURES
 9. Remove the duster from your shoulders and empty
the remaining dust back into the original container.
 10. Triple-rinse the duster and make sure that no dust
remains in the tank, the beater tube, the fan case,
or the discharge tubes.
 11. Air-dry the tank before you store the unit in a dry
area.
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 243 244

Comentarios a estos manuales

Sin comentarios