DOD SR400D Especificaciones Pagina 216

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 215
208
PACU-9 PRE-FLIGHT PROCEDURES
 24. Install the PACU-9 unit according to the above
instructions.
 25. HAND-check all lines and connections for tightness
and leaks.
 26. Load a funnel and two empty 5gallon cans (with
one spout or funnel) for backup to the pump.
 27. Have two separate containers of flushing solution
with 2-3 gallons in each.
 28. Ensure that ALL of the safety gear, flight helmets,
calibration jugs, a calibrated graduate cylinder,
spare rags, a hand pump, and the appropriate
tools are present.
 29. Put on all personal protective gear.
 30. Fill the pesticide tank by using a transfer pump,
power or hand driven. This pump is an essential
requirement for filling the tank in UH-1 aircraft.
Because of greater cabin height, the UH-3 allows
for filling the tank directly from cans if necessary.
In either case, the most rapid and efficient method
of filling is by means of a 28-volt motor driven low-
pressure fuel pump operated from an auxiliary
power unit.
 31. Add the EXACT amount of pesticide required for
the mission. Plan on using all of the material
Vista de pagina 215
1 2 ... 211 212 213 214 215 216 217 218 219 220 221 ... 243 244

Comentarios a estos manuales

Sin comentarios