DOD SR400D Especificaciones Pagina 211

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 210
203
D. ASSEMBLY: The PACU-9 is normally stored and
transported in the manufacturer's crates. One crate
contains the boom braces and attached nozzles,
while the second contains the pesticide tank
assembly. There are three basic steps involved in
assembling the PACU-9:
Boom Attachment
Unit Installation
Electrical Connections.
UNIT ASSEMBLY:
ATTACHMENT OF BOOM TO PESTICIDE TANK
 1. This procedure assumes that the required braces
have not YET been properly adjusted.
 2. Level the cradle.
 3. Connect the outboard ends of the boom braces to
the fittings provided on the boom. The bolts will be
secured later in the rigging procedure.
 4. Loosen the jam nuts on each of the threaded
fittings on the brace ends.
 5. Attach the boom to the cradle at the bottom
bracket using the 7/16” bolt and nut provided.
 6. Loosen the jam nuts on the threaded fittings of the
boom braces for the inboard attachment points.
Vista de pagina 210
1 2 ... 206 207 208 209 210 211 212 213 214 215 216 ... 243 244

Comentarios a estos manuales

Sin comentarios