DOD SR400D Especificaciones Pagina 199

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 198
191
PERFORMANCE CHECKLIST FOR THE
MICROGEN ED2-20A ULV SPRAYER
TESTING OF ENVIRONMENTAL CONDITIONS
FOR ULV APPLICATIONS
A. Check the weather conditions expected during the
spray operations, REMEMBER, YOU SHOULD NOT
CONDUCT ULV OPERATIONS IN THE RAIN OR IN
STRONG WINDS.
B. Check for a temperature inversion. A temperature
inversion has occurred when the air temperature at
six feet above the ground is at least one degree
warmer than the ground temperature. (This situation
usually occurs in the early morning and late evening
hours).
C. Check the wind speed by using a wind-measuring
device. The indicated wind speed should fall
between 4-6 MPH and should be blowing across the
intended target area.
SET-UP PROCEDURES
 1. Place the ULV unit in a pickup truck or on a trailer
and secure it for towing.
 2. Check the fuel level. Add regular leaded gas as
needed.
 3. Check the engine oil level. Add 30W oil as needed.
Vista de pagina 198
1 2 ... 194 195 196 197 198 199 200 201 202 203 204 ... 243 244

Comentarios a estos manuales

Sin comentarios