DOD SR400D Especificaciones Pagina 215

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 214
207
THE REMAINING ELECTRICAL INSTALLATION
PROCEDURES ARE ESSENTIALLY IDENTICAL
FOR EACH AIRCRAFT
 19. The ground terminal may be secured on the aft
cabin wall equipment tie down bracket located
directly behind the tank (A separate equipment
ground lead has been provided for the unit).
 20. Connect the power and ground cables to the
appropriate cannon plugs on the tank cradle.
 21. Connect the control cable to the proper receptacle
on the tank cradle.
 22. BEFORE the tank is filled with pesticide, turn on
the battery switch and:
 a. Check the operation of the two indicator lights
on the control box.
 b. Check the operation of the liquid flow control
valve, cycling it twice to ensure operation, and
leave it in the "OPEN" position.
 c. MOMENTARILY operate the pump switch to
check for proper motor operation.
 23. If the motor does not stop when the valve is
closed, or any other electrical function appears
incorrect. DO NOT PROCEED UNTIL THE
MALFUNCTION HAS BEEN CORRECTED.
Vista de pagina 214
1 2 ... 210 211 212 213 214 215 216 217 218 219 220 ... 243 244

Comentarios a estos manuales

Sin comentarios