DOD SR400D Especificaciones Pagina 181

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 180
173
 11. Turn both switches located on the right side of the
flow control panel OFF, (i.e., light and fog switch).
Place the toggle switch located on the remote
operator's station in the center position.
 12. Put on all personal protective gear.
 13. Add the calculated amount of pesticide to the
insecticide tank located in the rack behind the flow
control panel. REMEMBER, ULV/ULD machines
use only concentrated liquid formulations.
 14. Place the toggle switch located at the rear of the
frame between the engine and blower in the ON
position.
 15. Push the starter button located next to the switch
for a maximum of 30 seconds, or until the engine
starts. CAUTION: HEARING PROTECTION
REQUIRED.
 16. As the engine warms up, slowly open the choke.
OPERATING PROCEDURES
 17. Check the blower pressure gauge, located on the
right side of the Constant Volume (CV) flow control
panel, by temporarily holding your finger over the
hole in the plastic fitting to the right of the air
gauge. Pressure should read 6 psi. If not,
readjust the engine RPM by turning the idle speed
adjusting screw, located on the left side of the
carburetor below the gas line.
Vista de pagina 180
1 2 ... 176 177 178 179 180 181 182 183 184 185 186 ... 243 244

Comentarios a estos manuales

Sin comentarios